In accordance with the provisions of the Environmental Protection Law of the People's Republic of China, the Law of the People's Republic of China on Environmental Impact Assessment, the Regulations on the Administration of Environmental Protection for Construction Projects, and the requirements of the Measures for Public Participation in Environmental Impact Assessment, our company is currently carrying out the environmental impact assessment work for the “120,000 t/a Organic Acids and Supporting p-tert-Octylphenol and 27,000 t/a Polyether Project”. The relevant public information is as follows:
I. Basic information such as the name, site selection and construction content of the construction project
Project name: the 120,000 t/a Organic Acids and Supporting p-tert-Octylphenol and 27,000 t/a Polyether Project;
Nature of construction: renovation and expansion;
Project site: within the company's existing plant in the Baishui Lake Industrial Park, Nanchang Economic and Technological Development Zone (N28°46'56″, E115°53'35″);
Construction content: using the reserved development land to newly build and expand production units for a series of organic acids, p-tert-octylphenol, polyvinyl ether, polyethers and polyetheramines, mainly including: 1. expanding isononanoic acid by 60,000 t/a on the basis of the original 20,000 t/a, finally forming an isononanoic acid production scale of 80,000 t/a; 2. expanding capacity on the basis of valeric acid and isooctanoic acid co-produced in isononanoic acid production (alcohol dehydrogenation to aldehydes, oxidation to acids), finally forming a scale of 5,000 t/a of valeric acid (2,500 t/a each of n-valeric acid and iso-valeric acid) and 20,000 t/a of isooctanoic acid; 3. using diisobutylene co-produced in isononanoic acid production to produce p-tert-octylphenol, with an output of about 12,000 t/a of p-tert-octylphenol; 4. building a new 20,000 t/a isooctanoic acid unit (butanol-octanol process to aldehydes, oxidation to acids); 5. building a new 15,000 t/a heptanoic acid unit; 6. building a new 20,000 t/a polyvinyl ether unit; 7. building a new 6,000 t/a polyether and 1,000 t/a polyetheramine unit. At the same time, by-products include 4,240 t/a of hexane, 203 t/a of isooctane, 12.8 t/a of ethyl ether, 167.5 t/a of ammonia water (20%), etc. Supporting renovation and expansion of raw material and finished product tank farms and some public utility facilities.
Jiangxi Silinco Co., Ltd. was originally located at No. 1299 Yuping West Street, Nanchang Economic and Technological Development Zone. Due to the replanning and adjustment of construction land in the zone, the company relocated in 2013 to the Baishui Lake Industrial Park, Nanchang Economic and Technological Development Zone, Jiangxi Province. After the relocation and expansion, the production scale is 1,500 t/a of MMT, 3,000 t/a of MCPD (1,600 t/a for self-use), 5,000 t/a of high-purity manganese chloride (1,200 t/a for self-use), 40,000 t/a of diesel anti-wear additive, 20,000 t/a of cetane number improver, 50,000 t/a of sec-butyl acetate, 2,000 t/a of ultra-high-purity nickel nitrate and 5,000 t/a of refining catalyst. The project was approved by the Nanchang Municipal Environmental Protection Bureau on September 4, 2013 (Honghuan Approval No. 242). At present, the 5,000 t/a high-purity manganese chloride, 1,500 t/a methylcyclopentadienyl manganese tricarbonyl (600 t/a carbon monoxide (MMT raw material)) and 20,000 t/a cetane number improver have passed the self-environmental protection completion acceptance; the other products will no longer be built.
Complaints and administrative penalties received by the enterprise in the past five years: on February 19, 2019, for “discharging atmospheric pollutants in excess of standards”, the Nanchang Municipal Ecological Environment Bureau imposed a penalty under “Honghuan Xingfa [2019] No. 12” with a fine, and the penalty has been completed; on August 6, 2020, for “total manganese in the total wastewater outlet exceeding the standard”, the Nanchang Municipal Ecological Environment Bureau imposed a penalty under “Honghuan Xingfa No. 18” with a fine, and a hearing is currently being applied for and pending determination.
Exhaust gas from existing projects and treatment measures: 1# natural gas boiler flue gas (SO2, NOx, particulate matter, Ringelmann blackness): 15 m high exhaust stack (DA004); 2# natural gas thermal oil furnace flue gas (SO2, NOx, particulate matter, Ringelmann blackness): 15 m high exhaust stack (DA005); MMT workshop tail gas (non-methane total hydrocarbons): condensation absorption + 15 m high exhaust stack (DA006); C99 workshop acid tail gas (NOx, sulfuric acid mist): two-stage alkali scrubbing device absorption + 15 m high exhaust stack (DA007); manganese chloride workshop tail gas (particulate matter, manganese and its compounds): cyclone dust removal + spray tower + 15 m high exhaust stack (DA008); C99 denitrification waste gas (SO2, NOx, particulate matter): three-stage alkaline liquid water film desulfurization and dust removal + incinerator + 45 m high exhaust stack (DA009); oxidation unit waste gas (volatile organic compounds): two-stage condensation absorption + activated carbon adsorption + 15 m high exhaust stack (DA011); tail gas incineration boiler flue gas (SO2, NOx, particulate matter, Ringelmann blackness): 15 m high exhaust stack (DA012); sewage treatment station odor (ammonia, hydrogen sulfide, odor concentration): alkali water scrubbing tower + UV photolysis + activated carbon adsorption + 15 m high exhaust stack (DA013); C99 workshop organic tail gas (non-methane total hydrocarbons): two-stage activated carbon adsorption + 15 m high exhaust stack (TD001); Class A tank farm (methanol): condensation + 8 m high exhaust stack (TD002); Class A tank farm (diisobutylene): condensation + 8 m high exhaust stack (TD003).
Wastewater treatment measures for existing projects: comprehensive sewage treatment station: treatment capacity of 200 t/d; main structures of the sewage treatment station: air flotation tank + scum tank + micro-electrolysis tank + upflow anaerobic sludge blanket reactor + coagulation sedimentation tank + biological contact oxidation tank + hydrolysis acidification tank + aerobic tank + coagulation tank + biological aerated filter; workshop wastewater treatment station: treatment capacity of 80 t/d, process: SBR. Emergency accident pool: 1,500 m³, buried type next to the sewage treatment station; plant initial rainwater collection pool (also serving as firefighting wastewater collection pool): 1,500 m3, buried type next to the sewage treatment station.
Solid waste: hazardous waste from existing projects is temporarily stored in the built hazardous waste warehouse in the plant (244 m2, maximum storage capacity 250 t), and is regularly handed over to units with corresponding hazardous waste disposal qualifications for treatment; general solid waste is sold externally for comprehensive utilization, and the general solid waste yard is located in the north of the plant, covering an area of 225 m2.
II. Name and contact information of the construction unit
Construction unit: Jiangxi Silinco Co., Ltd.
Contact person: Director Hua
Contact phone: 15083647575
Correspondence address: Baishui Lake Industrial Park, Economic and Technological Development Zone, Nanchang.
III. Name of the unit preparing the Environmental Impact Assessment Report
Assessment unit: Jiangxi Shengyou Environmental Protection Technology Co., Ltd.
Contact person: Mr. Pi
Contact phone: 0792-8159819
Email: jxsyhb2020@126.com
Correspondence address: Hengsheng Science and Technology Park, Jiujiang Economic and Technological Development Zone.
IV. Working procedures and main work content of the environmental impact assessment
(1) Working procedures
① The construction unit commissions a qualified EIA institution
② The construction unit makes the first public announcement (i.e. this announcement)
③ The EIA institution prepares the Environmental Impact Assessment Report
④ The construction unit publishes the draft for comments
⑤ The construction unit submits the environmental impact assessment documents to the competent environmental protection authority for approval
(2) Main work content
By monitoring and evaluating the current status of the atmospheric, surface water and noise environment in the project area, the current environmental quality of the region will be ascertained. Through detailed engineering analysis of the project, the types, quantities and discharge characteristics of pollutants generated by the project will be identified. Using reasonable assessment methods, the possible impacts of the project construction on the construction area will be comprehensively evaluated, public opinions will be fully solicited, the feasibility of the project and its site selection will be demonstrated, the clean production level of the project will be reviewed, the feasibility and reliability of the project's environmental protection measures will be analyzed, and comprehensive prevention and control measures that must be taken to mitigate adverse impacts to the lowest reasonable and feasible level will be proposed. A conclusion on whether the project is feasible from an environmental protection perspective will be given, providing a scientific basis for the supervision and management of the construction project and the design of environmental protection facilities.
V. Scope of the public whose opinions are solicited
Citizens, legal persons and organizations within the scope of the environmental impact assessment of this project; citizens, legal persons and other organizations outside the scope of the environmental impact assessment are encouraged to participate.
VI. Ways and means for the public to raise opinions
The public may submit opinions and suggestions to the construction unit by downloading and filling in the public opinion form, and after filling it in, may provide feedback to the construction unit by letter, telephone, email or other means.
When submitting opinions, the public is requested to provide valid contact information; real-name submission with a permanent address is encouraged. It is promised that personal information submitted by the public will not be used for purposes other than public participation in the environmental impact assessment.
VII. Online link to the public opinion form
https://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html.
Jiangxi Silinco Co., Ltd.
January 23, 2024